Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 10 results ...

Buchmann-Slorup, R (2014) Applying critical chain buffer management theory in location-based management. Construction Management and Economics, 32(06), 506-19.

Gatti, U C, Migliaccio, G C, Bogus, S M and Schneider, S (2014) An exploratory study of the relationship between construction workforce physical strain and task level productivity. Construction Management and Economics, 32(06), 548-64.

Isaac, S and Navon, R (2014) Can project monitoring and control be fully automated?. Construction Management and Economics, 32(06), 495-505.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446193.2013.795653
  • Abstract:

    An extended research programme has examined over the past two decades how productivity in construction projects can be improved through the development of models for project monitoring and control, which process automatically collected data on the actual project performance. Tests that were conducted with these models demonstrate that this approach can help overcome some of the limitations of existing manual methods. However, they also indicate that certain manually obtained data are still required in addition to the automatically collected data. A framework for semi-automated project monitoring and control is proposed, in which both manually and automatically collected data can be incorporated. This framework integrates the monitoring of projects with their control by taking into account the impact on productivity of existing deviations from the planned performance, and of the controlling actions that are proposed to deal with these deviations.

Lucko, G, Alves, T D C L and Angelim, V L (2014) Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling. Construction Management and Economics, 32(06), 575-94.

Nasir, H, Ahmed, H, Haas, C and Goodrum, P M (2014) An analysis of construction productivity differences between Canada and the United States. Construction Management and Economics, 32(06), 595-607.

Russell, A D, Tran, N and Staub-French, S (2014) Searching for value: construction strategy exploration and linear planning. Construction Management and Economics, 32(06), 520-47.

Seppänen, O, Evinger, J and Mouflard, C (2014) Effects of the location-based management system on production rates and productivity. Construction Management and Economics, 32(06), 608-24.

Sezer, A A and Brochner, J (2014) The construction productivity debate and the measurement of service qualities. Construction Management and Economics, 32(06), 565-74.

Van der Vlist, A J, Vrolijk, M H and Dewulf, G P M R (2014) On information and communication technology and production cost in construction industry: evidence from the Netherlands. Construction Management and Economics, 32(06), 641-51.

Vilasini, N, Neitzert, T and Rotimi, J (2014) Developing and evaluating a framework for process improvement in an alliance project: a New Zealand case study. Construction Management and Economics, 32(06), 625-40.